26 ledna 2026
AeronovaNews| NOVA-2 tail control surfaces: formation of the structure and start of assembly
26 ledna 2026
At the production site in Lyubertsy, the manufacturing process for the NOVA-2 airship's tail control surfaces continues.
• Individually manufactured components that form the structural and geometric foundation of the future tail assembly have been assembled and positioned.
• Element-by-element preparation of the structure is underway: parts are marked out, degreased, primed, and subsequently painted—this is necessary to ensure corrosion resistance and the durability of the assemblies.
After painting, all components will be returned to their design position. Then the tail assembly will be sequentially assembled into a single structure.
The next stage is covering the control surfaces with a special fabric that will form the aerodynamic surface and ensure the required performance characteristics.
This is another production step toward a fully functional aerodynamic control system for the NOVA-2 airship.
Join the project and become a co-owner of the business that is building modern airships.
*The translation is done with the help of artificial intelligence.
Čtěte také
Effective April 1, we are closing the reinstatement of installment plans for the Duyunov Motors project
Learn the details
2 března 2026
Opening access to the stage 0 shares in the New Generation Airships project
Learn more
26 února 2026
AeronovaNews | NOVA-2: production base, testing, and commercialization pathway
Read more
20 února 2026