11 február 2026
Production of the NOVA-2 tail assembly
11 február 2026
One of the stages of manufacturing the empennage control surfaces of the NOVA-2 airship is shown in detail in a video from the manufacturing site.
The footage features 2 production processes.
1. Assembly of structural elements with Cleco fasteners
At this stage, parts are precisely fixed in their design position. Cleco fasteners make it possible to temporarily assemble the structure, preserve geometry, and check the fit of components before final fastening.
2. Riveting with blind rivets
After verifying the geometry, the elements are permanently joined. Blind riveting is used where access is only possible from one side of the structure, ensuring the required strength and reliability of the assemblies.
This sequence of operations enables quality control at every step and results in a rigid, precise, and production-repeatable structure — the foundation of the airship’s aerodynamic control surfaces.
Watch the video to learn more!
Find out how, from as little as $50, you can obtain shares in a high-potential company that is creating New Generation Airships!
*The translation is done with the help of artificial intelligence.
Čítajte tiež
Reinstatement of installment plans in the project will be permanently discontinued as of may 1
Take advantage
2 apríl 2026
What we recommend if bank card payments are not working
A brief update on card payments
1 apríl 2026
Get your ticket for the VIP-TRIP with SOLARGROUP leaders!
A new opportunity for the most ambitious partners
31 marec 2026